ARDEX A 38 produces ultra-rapid drying floor screeds which can be walked on after just 3 hours, and have floorcoverings installed in as little as 4 hours, regardless of thickness.

Use ARDEX A 38 for bonded, unbonded and floating screeds in internal and external locations, including wet areas such as swimming pools.

  • Walk on after 3 hours
  • Receives ceramic and natural stone tiles directly after only 4 hours
  • Install carpet, wood and vinyl floorcoverings after 48 hours
  • Maintains a working time of 1 hour
  • Passes BRE Screed (ISCR) Testing after 6 hours
  • After just one day, achieves the acceptable minimum compressive and tensile bending strengths attained by an ordinary cement screed after 28 days
  • For internal and external use, including wet and submerged areas

Unit Size Available: 25kg

Coverage: Approximately 3.2m2 at 25mm thick per 25kg unit

 

Download the latest datasheets and certificates here;

ARDEX A38 Technical Datasheet (TDS)

ARDEX A38 Health & Safety Datasheet (SDS)

ARDEX A38 Declaration of Performance (DOP)

ARDEX A38 Sustainability Datasheet

ARDEX A38 Environmental Product Declaration (EPD)

ARDEX A38 Emicode Certificate

 

THICKNESS
Bonded
15-40mm

Unbonded
50mm+

Floating Domestic
65mm+

Floating Commercial
75mm+

Working time at 20°C
approx. 1 hour

Walkability at 20°C
approx. 3 hours

Consumption per m²/mm
0.31kg

Typical Mix Ratio (Cement:Sand)
1:5

COMPRESSIVE STRENGTH USING 0-8MM GRADED AGGREGATE
After 1 day 25.0 N/mm²
After 7 days 40.0 N/mm²
After 28 days 45.0 N/mm²

TENSILE BENDING STRENGTH (1:5)
After 1 day 4.0 N/mm²
After 7 days 4.5 N/mm²
After 28 days 5.5 N/mm²

BRE SCREED TEST
Normally after 6 hours

MOISTURE TESTING
The Speedy Moisture Tester (Carbide Method) must be used to test moisture. Please consult ARDEX Technical Services for further advice.

British Standard Codes of Practice
BS 8204: Part 1. In situ Floorings – Bases and Screeds.
BS 5385: Part 3. Appendix C. Ceramic Floor Tiling and Mosaics.
BS 8000: Part 9. Code of Practice for cement/sand floor screeds and concrete floor toppings (Workmanship on building sites).

Embodied carbon
(A1-A3 production stage as defined in BS EN 15804)
0.49 kg CO₂ eq/kg