Hi, how can we help you? Hi, how can we help you?

Hi, how can we help you?

Hi, how can we help you? Hi, how can we help you?

46 results for "sand and cement screed"

How to repair a hole in sand and cement screed with ARDEX A 38 MIX
If you're looking to repair a hole in sand and cement screed, ARDEX A 38 MIX is easy to use, and dries pretty fast too. Just
0 comments 4
How do I level over sand and cement screeds and concrete?
Sand and cement screeds and concrete can be highly porous and absorb moisture from subsequently applied levelling compounds
0 comments 2
How do I tile to heated sand and cement screeds?
Before tiling to heated sand and cement screeds, you must first ensure the underfloor heating has been commissioned. As per
0 comments
How to repair cracks in concrete with ARDEX P 10 SR - Rapid Hardening Crack Repair Resin Kit
non-structural cracks and joints in concrete and sand/cement screeds. Sold as a complete kit, consisting of mixing bottles
0 comments
Why do I need to wait so long before tiling to certain substrates?
least 6 weeks Traditional sand and cement screeds: at least 3 weeks Traditional sand and cement renders: at least 2 weeks
0 comments -1
How do I prolong the open time of my tile adhesive?
When tiling to sand and cement screeds and concrete, the substrate can be dampened with water using a mist sprayer. This
0 comments
How do I fill holes before tiling?
tiling, localised holes and cracks in concrete, sand and cement screeds, steps and window returns, together with gaps around
0 comments -1
How do I stick down uncoupling membranes?
floorboards and dry concrete, as well heated and unheated sand and cement screeds and levelling compounds. After 5-10 minutes, the
0 comments -2
When should I commission underfloor heating?
As per BS 5385-3, traditional sand and cement screeds should be at least 21 days old, at which point the underfloor heating
0 comments