46 results for "sand and cement screed"
How to repair a hole in sand and cement screed with ARDEX A 38 MIX
If you're looking to repair a hole in sand and cement screed, ARDEX A 38 MIX is easy to use, and dries pretty fast too. Just
How do I level over sand and cement screeds and concrete?
Sand and cement screeds and concrete can be highly porous and absorb moisture from subsequently applied levelling compounds
How do I tile to heated sand and cement screeds?
Before tiling to heated sand and cement screeds, you must first ensure the underfloor heating has been commissioned. As per
How to repair cracks in concrete with ARDEX P 10 SR - Rapid Hardening Crack Repair Resin Kit
non-structural cracks and joints in concrete and sand/cement screeds. Sold as a complete kit, consisting of mixing bottles
Why do I need to wait so long before tiling to certain substrates?
least 6 weeks Traditional sand and cement screeds: at least 3 weeks Traditional sand and cement renders: at least 2 weeks
How do I prolong the open time of my tile adhesive?
When tiling to sand and cement screeds and concrete, the substrate can be dampened with water using a mist sprayer. This
How do I fill holes before tiling?
tiling, localised holes and cracks in concrete, sand and cement screeds, steps and window returns, together with gaps around
How do I stick down uncoupling membranes?
floorboards and dry concrete, as well heated and unheated sand and cement screeds and levelling compounds. After 5-10 minutes, the
We are currently working on an office refurbishment where we’re removing the existing walls. Can you recommend a product to fill the trenches and level any areas where the floor height may differ?
is a pre-blended screed cement that can be used to repair large areas of existing sand/cement screed floors up to 65mm thick
When should I commission underfloor heating?
As per BS 5385-3, traditional sand and cement screeds should be at least 21 days old, at which point the underfloor heating