Hi, how can we help you? Hi, how can we help you?

Hi, how can we help you?

Hi, how can we help you? Hi, how can we help you?

48 results for "sand and cement screed"

How do I level over sand and cement screeds and concrete?
Sand and cement screeds and concrete can be highly porous and absorb moisture from subsequently applied levelling compounds
0 comments 3
How to repair a hole in sand and cement screed with ARDEX A 38 MIX
If you're looking to repair a hole in sand and cement screed, ARDEX A 38 MIX is easy to use, and dries pretty fast too. Just
0 comments 4
How do I tile to heated sand and cement screeds?
Before tiling to heated sand and cement screeds, you must first ensure the underfloor heating has been commissioned. As per
0 comments
Do we have a suitable product to smooth over a newly installed sand/cement screed?
New sand and cement screeds should be left for 3 weeks before any work is carried out. Where a sand and cement screed is over
0 comments
Why do I need to wait so long before tiling to certain substrates?
least 6 weeks Traditional sand and cement screeds: at least 3 weeks Traditional sand and cement renders: at least 2 weeks
0 comments
How do I prolong the open time of my tile adhesive?
When tiling to sand and cement screeds and concrete, the substrate can be dampened with water using a mist sprayer. This
0 comments 1
How to repair cracks in concrete with ARDEX P 10 SR - Rapid Hardening Crack Repair Resin Kit
non-structural cracks and joints in concrete and sand/cement screeds. Sold as a complete kit, consisting of mixing bottles
0 comments
How do I fill holes before tiling?
tiling, localised holes and cracks in concrete, sand and cement screeds, steps and window returns, together with gaps around
0 comments -1
How do I stick down uncoupling membranes?
floorboards and dry concrete, as well heated and unheated sand and cement screeds and levelling compounds. After 5-10 minutes, the
0 comments -2