48 results for "sand and cement screed"
How do I level over sand and cement screeds and concrete?
Sand and cement screeds and concrete can be highly porous and absorb moisture from subsequently applied levelling compounds
How to repair a hole in sand and cement screed with ARDEX A 38 MIX
If you're looking to repair a hole in sand and cement screed, ARDEX A 38 MIX is easy to use, and dries pretty fast too. Just
How do I tile to heated sand and cement screeds?
Before tiling to heated sand and cement screeds, you must first ensure the underfloor heating has been commissioned. As per
Do we have a suitable product to smooth over a newly installed sand/cement screed?
New sand and cement screeds should be left for 3 weeks before any work is carried out. Where a sand and cement screed is over
Why do I need to wait so long before tiling to certain substrates?
least 6 weeks Traditional sand and cement screeds: at least 3 weeks Traditional sand and cement renders: at least 2 weeks
How do I prolong the open time of my tile adhesive?
When tiling to sand and cement screeds and concrete, the substrate can be dampened with water using a mist sprayer. This
How to repair cracks in concrete with ARDEX P 10 SR - Rapid Hardening Crack Repair Resin Kit
non-structural cracks and joints in concrete and sand/cement screeds. Sold as a complete kit, consisting of mixing bottles
How do I fill holes before tiling?
tiling, localised holes and cracks in concrete, sand and cement screeds, steps and window returns, together with gaps around
How do I stick down uncoupling membranes?
floorboards and dry concrete, as well heated and unheated sand and cement screeds and levelling compounds. After 5-10 minutes, the
We are currently working on an office refurbishment where we’re removing the existing walls. Can you recommend a product to fill the trenches and level any areas where the floor height may differ?
is a pre-blended screed cement that can be used to repair large areas of existing sand/cement screed floors up to 65mm thick