98 results for "tiling to plywood floor"
How do I tile to plywood floors?
mechanically fixed tile backer board, which can then be tiled as normal using an appropriate ARDEX Cement-Based Tile Adhesive.
How do I waterproof plywood floors before tiling?
waterproof plywood floors before tiling, install an appropriate waterproof uncoupling mat or waterproof tile backer board
How do I tile to plywood walls?
Tiling to plywood walls is no longer recommended under BS 5385-1:2018. Plywood walls should be oversheeted with tile backer
How to level a floor for tiling with ARDEX K 40 HB
flexibility - Apply from 3mm to 40mm in a single application - Tile after 2 hours - Trowel marks drop out with ease - Walk on
Does ARDITEX NA require priming?
subfloors without priming including ceramic tiles, bitumen and flooring grade plywood. On absorbent surfaces, such as cement and
How do I tile to anhydrite screeds?
Once the ARDEX P 51 is dry, tile as normal using an appropriate ARDEX Cement-Based Tile Adhesive.
How do I tile to steel?
P 82. Once dry, it can then be tiled as normal using an appropriate ARDEX Cement-Based Tile Adhesive.
What's the best ARDEX levelling compound for my project?
substrates without the need to prime, including flooring grade plywood, ceramic tiles, steel, and even over old bitumen adhesive
How do I tile to plaster?
Before tiling to plaster, you must first ensure it is at least 4 weeks old and that the total weight of the tiling will not