61 results for "commissioning underfloor heating"
When should I commission underfloor heating?
the underfloor heating can be increased by 5⁰C every day until the maximum water temperature advised by the underfloor heating
How do I tile to heated sand and cement screeds?
Before tiling to heated sand and cement screeds, you must first ensure the underfloor heating has been commissioned. As per BS
How do I tile over electric underfloor heating systems?
Before tiling to electric underfloor heating systems, the cables should be encapsulated using an appropriate ARDEX Levelling
What is the maximum temperature I can have my underfloor heating at with your levelling compounds?
British Standards advise a maximum surface floor temperature of 27-29°C, and all of our Screeds, Levelling and Smoothing
Can I install an ARDEX system over underfloor heating?
solution for their retro-fit water-fed underfloor heating and in-screed underfloor heating systems. ARDEX products have been extensively
KNOPP CONTOPP Ultimate 4
50mm = 3 days 60mm = 5 days 70mm = 7 days Underfloor Heating Commissioning: After 24 hours: 35°C After 48 hours: 55°C After
How To Install The Most Popular Floor Coverings With ARDEX AF 2365 Universal Flooring Adhesive
a high temperature resistance and can be used over underfloor heating systems.
FA20
Suitable for underfloor heating Yes NOTE: If smoothing timber floors incorporating underfloor or undertile heating systems
DS20
Easy to apply and to cut Suitable for use with underfloor heating Unit Size Available: 50m x 1m roll Download
ARDITEX NA®
even at lower temperatures Suitable for use with underfloor heating Unit Size Available: 20kg Powder & 4.95kg